Snapdragon's Gallery

Desks taking shape. You can see at the bottom left that the cable pulling was already finished and the new hole in the wall and plate installed. That is where the rack will go when I get it over here (for secondary and local servers - primary servers are still downtown in a separate building on fiber).

Desks taking shape. You can see at the bottom left that the cable pulling was already finished and the new hole in the wall and plate installed. That is where the rack will go when I get it over here (for secondary and local servers - primary servers are still downtown in a separate building on fiber).

000_0485.jpg 000_0486.jpg 000_0487.jpg 000_0488.jpg 000_0489.jpg
Rate this file (Current rating : 0 / 5 with 3 votes)