Snapdragon's Gallery

Desks taking shape. You can see at the bottom left that the cable pulling was already finished and the new hole in the wall and plate installed. That is where the rack will go when I get it over here (for secondary and local servers - primary servers are still downtown in a separate building on fiber).

Desks taking shape. You can see at the bottom left that the cable pulling was already finished and the new hole in the wall and plate installed. That is where the rack will go when I get it over here (for secondary and local servers - primary servers are still downtown in a separate building on fiber).

000_0487.jpg i000772_big.jpg 000_0479.jpg i000765_big.jpg i000770_big.jpg
Rate this file (Current rating : 0 / 5 with 3 votes)