|
369 viewsReverse view from window to door
|
|
368 viewsSecond coat
|
|
365 viewsRJ11 keystones installed, waiting to get RJ45 and coax keystones.
|
|
364 viewsOut into the shared hallway
The "office" itself is actually a suite that has been divided into four rooms for tenants who don't require a reception area or lots of room.
|
|
356 viewsBack at the "home" office, disassembling the desks to haul over to the new office.
|
|
352 viewsDesks taking shape. You can see at the bottom left that the cable pulling was already finished and the new hole in the wall and plate installed. That is where the rack will go when I get it over here (for secondary and local servers - primary servers are still downtown in a separate building on fiber).
|
|
350 viewsTiles are up, we started into the ceiling to find the conduits to pull the cable. Silly me forgot to take pictures of THAT fun night, locating the old phone line in the conduit that was jamming it, yanking it out, pulling new rope with the old twine, then pulling our new Cat 5 and coax lines.
|
|
348 viewsSecond corner assembled, sides to be done
|
|
346 viewsDesks arrived in pieces at the new office.
|
|
340 views
|
|
321 views
|
|
|
|